My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-04-07_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-04-07_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 4:00:58 PM
Creation date
11/21/2007 10:47:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/7/1992
From
D J PENDLETON
To
BATTLE MOUNTAIN GOLD
Type & Sequence
TR3
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APR Gt? '9c ~=~~7G F'fl <br />APPENDIX IV <br />REPLY TO DOC. N0. 2382F_ POINT (3) <br />P. 10•'7 <br />BEI wishes to further clarify Point (3). It believes (along with BMG) that this <br />point refers to the suitable reduction of free-cyanide (as defined in Appendix <br />I) and not to the reduction of Cu WAD. <br />However, BMG is (like the State} sufficiently concerned about Cu WAD that 1t <br />wishes to discuss its elimination aTSO, herein. <br />A. Timetable for Free CN Reduction <br />Conditions <br />1. The Cytox chemical shall be used to reduce (CN)~ to acceptable levels of <br />less than 30 ppm. '(t.~ ~~,,,_ ,,,~~,~„~, ,~ <br />2. The ponds contains 301 x 108 gal. of water which is recycled at <br />approximately V DOD gal ml and therefore requires 21 days to <br />"theoretically" have complete pond replacement. <br />3. BEI requests that Colorado permit two pond cycles t0 achieve safe levels <br />of free-cyanide: say 42 days. <br />4. BMG shall, for 42 days, provide "defense" to prevent the landing of <br />wildfowl and thereby forestall even the possibility of their death. <br />Schedule (this estimate to be confirmed by 4-10-92) <br />1. Approval by State to use Cytox = Oa-07-92 o.,N< a-6 <br />2. Install Cytox delivery system = 04-08-82 a-e <br />3. Commence Cytox technology = 04-09-92 q ~ <br />4. Reduce Free-CN, monitor, complete retluctien = 04-9/0~-21-92 ~ ~~~-~ <a,.4...~...-._ <br />5. Final Report of results = 05-25-92 """~`t°*~• <br />6. Daily reports to the Division -> ,3e~4 ... ,~~ a....~e<,-l,yy r~s«ri~a . <br />Oyr modus operandi shalt be as follows: J <br />1. BEI shall install a fait-safe "Cytox Delivery System" at BMG San Luis <br />accurate to ±0.7 1b/min and delivering at approximately 2 1b/min depending <br />upon stoichiometry. ~(.~, <br />2. Said system shall be a screw conveyor. .i : i ~~Lt~ ~ ~ f~• <br />b-C~~~. CY~ox .n~ ~,.- <br />3. Said system to be installed prior to the existing AVR. <br />4. Said system to reduce pH (depending upon stoichiometry) to between ph 8.5- <br />9.0. <br />5. The AVR shall Continue to operate save for the fact that H~S04 shat-1 not <br />be in,)ected since it is not required (due to Cytox). <br />6. AVR to continue to generate HQ'1 for co'iection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.