Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Departrnent of Natural Resources e- <br />1313 Sherman St., Room 215 <br />MAR <br />Denier, Colorado 80203 7 g ppp~ <br />Phone: (303) 866-3567 <br />~ <br />~ <br />~ <br />FAX: (3031832.8106 ~ <br />~' <br />~'"' n°~~jRl3tran, <br />honi <br /> ng ono Safety <br />TRANSFER OF MINERAL RECLAMATION PERMIT <br />AND <br />SUCCESSION OF OPERATORS <br />APPLICATION PACKAGE <br />AooGcabitity <br />COLORADO <br />DIVISION O F <br />MINERALS <br />GEOLlJGY <br />RECLANATION•NINING <br />SMETT`SCIENCF <br />Bill Owens <br />Govenlor <br />Russell Ceolge <br />Executive DIIeROr <br />Ronald W. ('annoy <br />Divkgn Dilectw <br />Natural Resounx Trustee <br />This document applies to mining operations where the current permitted mine operator wishes to transfer the Reclamation <br />Pemrit and permitted reclamation responsibilities to a Sucxssor Operator (a nevi operator). Please follow the instructions <br />provided in this package far filing an applicatit~; Mineral Rules and Regulations and Construction Material Rules and <br />Regulations Number 1.12 (Permit Transfix application requi[ements) should aLgo be reviewed prig to completing this form. <br />Fitine Reauirementa <br />To apply for a transfer please slrbmit the following to the Division of Minerals and Geology (the ^DivisiDa~): <br />1) A "Transfer of Permit and Suceession of Operator" application farm, signed and notarized by an authorizod <br />representative of ~'fi the current permittee and successor operator, <br />2) The ApplicatioD Fee of S 100.00 for Hard Rock operations and E 125.00 for Construt~on Materials operations; <br />3) A Performance Warranty Fam bearing an original notarized signature of as authorized representative of the <br />successor operator; and, <br />4) FiDarlcial Warranty: <br />A) You have the option to WANE YOUR RIGHT to a thirty (30} dny processing time to allow the Division <br />time to recalculate the required financial warranty; or, <br />B) You may choose NOT TO WANE YOUR RIGHT to a thirty (30) day processing time. In such case, the <br />Division will recalculate the required SDancial warrazlty within sixty (60) days from the decision date (the <br />date the permit is transferred to the Suceessor Operator). The required RECLAMATION BOND COULD <br />BE SUBSTANTIALLY INCREASED at that time. Tf the financial warranty is irtrneased, you will dren be <br />required to post the additional financial wammty. <br />This applicati~ package contains the "Transfer of Permit and Successior< of Operator" application farm, and a Performance <br />Warranty form for yo»r use. Rule 4.3 of the Mineral Rules and Regulations and Rule 4.3 of the Construction Material Rriles <br />and Regulations describes the various acceptable Financial Warranty types. Please contact the Division to obtain the <br />appropriate Financial Warranty form <br />Office of Office of Colorado <br />