Laserfiche WebLink
STORMWATER MANAGEMENT PLAN (SWMP) <br />AND EROSION AND SEDIMENT CONTROL REPORT <br />FOR <br />ST. VRAIN LAKE GRADING IMPROVEMENT PLANS <br />Page 15 <br />area. All employees should be notified of the location of the MSDS and <br />the cleanup material storage location and should be trained to clean up <br />spills. All construction site personnel must follow spill prevention and <br />control practices as follows: <br />• Designated individuals on the site will receive training on cleanup <br />procedures for various types of chemicals and the location of <br />information and cleanup supplies. The MSDS for a chemical <br />provides information about health hazards, safe handling, use, and <br />control measures. The MSDS for all chemicals used on the site will <br />be kept on the site, and workers will be required to review the MSDS <br />for materials they are working around. <br />• Spills will be cleaned up promptly after discovery, and materials <br />used for spill cleanup must be disposed of offsite at an approved <br />facility. <br />• Personnel will wear appropriate protective equipment to prevent <br />injury resulting from contact with a toxic substance. <br />• The designated coordinator and the SWMP Administrator will be <br />notified immediately of any spill of a toxic or hazardous material that <br />threatens human health or the environment. The SWMP <br />Administrator (or designee) must in turn report the spill to the <br />appropriate federal, state, or local agencies in accordance with <br />applicable regulations. <br />If a spill occurs, this plan will be reviewed and appropriately revised <br />to incorporate measures to reduce the likelihood of a spill <br />reoccurring and to improve response time and cleanup <br />' effectiveness. <br />For any construction activities covered by Phis plan that involve the <br />use of toxic or hazardous substances, on-site spill prevention and <br />cleanup coordination, in the event of a spill, will be the responsibility <br />' of the site superintendent. <br />~, <br />• Sweeping will be required of adjacent roadways weekly minimum <br />~ ~ and daily during hauling (at the end of the day). <br />1, <br />