Laserfiche WebLink
Page 3 of 4 <br />Included with this submittal are the tables that summarize the quantities and the costs <br />used for the work. Included as an Appendix to this report is a set of more detailed <br />calculation sheets that reference the drawings from which the dimensions of structures <br />were taken. A plan view of the site indicating the process area delineation and labels of <br />structures is also attached. <br />Please contact us with questions regarding this cost estimate or the assumptions that <br />were made. Banks and Gesso, LLC appreciates the opportunity to do this work for the <br />Cemex Lyons Plant. <br />Regards, <br />Banks and Gesso, LLC <br />~l,c~~ U~ <br />M. Danelle Volpe, PE <br />enc: Tables 1,2,3,4 & 5 <br />Drawing <br />Appendix of calculations <br />X:\Projecls By ClientlCemex Inc\0300bBO~W Cakulation\Phase II-Start to Submittal\234Engineering Design- <br />Construction Orwg's\work product\MDV-JLOHR-bondcak,Ietter020703.doc <br />