Laserfiche WebLink
<br />Memo to Christine Johnston -2- April 18, 1994 <br />6. The Division's original adequacy review requirement for direct haul of topsoil, salvaged from <br />the storage bench area, to the non-topsoiled areas of the Lower Refuse Pile should still <br />stand. Rule 4.06.3(1) requires immediate placement of topsoil unless this procedure is <br />impractical. MCC should coordinate to have the Lower Refuse Pile recontoured and ready <br />for topsoiling before construction begins on the storage bench. Additionally, if there are any <br />other areas of the mine that will require reclamation during the time topsoil is being <br />salvaged, direct haul should be utilized. <br />7. The Division has provided CDOW and USFWS the opportunity to comment on TR-67 and <br />has not received any response; therefore, the operator's response is acceptable. <br />SSS/bjw <br />m:\oss\bjw\sss.mcc <br />