Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmenl n( Nalu ral Re~uu n'c~ <br />I }1 7 Sherman 51., Ruum ! 15 <br />Denver, GJuradu H(1'!II} <br />Phone' l30}I Hfifi-]Sl+i <br />FA%: (3051 H}2~HIU6 <br />November 17, 1995 <br />I~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Rnmrr <br />Govemm <br />lanrc~ 5. Lo~hhead <br />E xecwn'e Uueclor <br />Mr. Mike Altavilla, P.E. <br />Engineering Manager unu nn ou ~lor <br />Seneca Coal Company <br />P.O. Drawer D <br />Hayden, CO 81639 <br />RE: Midterm Review, Hayden Gulch Loadout, Permit No. C-92-081, Hayden Gulch <br />Terminal, Inc. <br />Dear Mr. Altavilla: <br />Enclosed is the Division's midterm review of the Hayden Gulch Loadout permit <br />application. The review contains adequacy questions which the Division would like <br />answered in a reasonable time. As a result of this midterm review, there may be <br />changes to the permit application. These changes would need to be incorporated into <br />the permit application through the revision process. <br />If you have any questions, please call rne. <br />Sincerely <br />.~j~ <br />l='~~'~ ~, _. <br />Josep as <br />Environmental Protection Specialist <br />Enclosures <br />^n:\O55\ammUhavilla ild <br />