Laserfiche WebLink
• ~ • <br />d) The subsidence monitoring plan for the east end of the l2 Right panel is <br />presented on pages 2.05-191.4 and 2.05-191.5. This plan was developed after <br />discussions with the Division as to the necessity of establishing the system <br />proposed by the DMG. Two copies of the revised pages are enclosed. <br />e) The proposed subsidence monitoring plan referenced in d) above responds to <br />the Division's comment. <br />51. Two copies of Exhibit 6I are enclosed. I have contacted the SHPO and it is agreed <br />that TCC will survey portions of sections lb and 17 that will be subsided and lie <br />within the AVF. The survey work should be completed within the next 7 - 10 <br />days and then the report forwarded to the SHPO for their files. If no sites are <br />found then the entire process should be completed within 30 days. The report will <br />be forwarded to the Division for inclusion as an exhibit in PR-5. <br />52. Page 2.04-12 and 12.1 were revised to address the Division's concern. Two <br />copies of the revised pages are enclosed. <br />63. (a) Pages 2.04-16 and 16.1 were modified to address the Division's concern. Two <br />copies of the revised pages are enclosed. <br />(b) and (c) Pages 2.04-16.2, 16.3 and 2.04-17 were revised to address the <br />Division's concerns. Two copies of the revised pages are enclosed. <br />93. Pages 2.03-17 through 2.03-18.3 were revised to address the Division's concerns. <br />Two copies of the revised pages are enclosed. <br />96. Pages 2.03-24 and 24.1, dated 5/3/00 were modified to reflect the correct permit <br />boundary description for section 25. Copies of these pages were previously <br />submitted to the Division. in reference to the permit boundary shown on Maps L <br />and 2, it is correctly drawn on these two maps. The permit boundary shown on <br />Maps 23 and 23B of technical revision 00-37 reflects this boundary also. As <br />opposed to resubmitting the existing maps 23 and 23B it is requested the pending <br />maps 23 and 23B be referenced for the permit boundary. 1[ appears this TR may <br />be approved prior to PR-5 due to the added cultural survey work; therefore, this <br />may be a moot point. <br />108. Page 2.04-16.2 was previously modified to respond to the Division's concern. No <br />further response is needed to address this comment. <br />