Laserfiche WebLink
<br />Ms. Christine Johnston <br />Mountain Coal Company <br />Page 2 <br />June 11, 1997 <br />5. The designs for ditches DSLY-]0 through DSLY-14 aze based on a vegetated channel. <br />Immediately following construction, the ditches will not have adequate vegetation to <br />control channel erosion. Please provide an interim design for the period between <br />construction and establishment of vegetation. <br />Please call if you have any questions. <br />Sincerely, <br />Michael P. Boulay <br />Environmental Protection Specialist <br />c: Susan Burgmaier, David Berry <br />