My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV88563
DRMS
>
Back File Migration
>
Revision
>
REV88563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:10:41 AM
Creation date
11/21/2007 10:43:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
6/11/1997
Doc Name
MINOR REVISION 216 VENTILATION SHAFT 3 WEST ELK MINE PN C-80-007
From
DMG
To
MOUNTAIN COAL CO
Type & Sequence
MR216
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Rewurces <br />1713 Sherman 51 ,Room 215 <br />Denver, Colorado 80203 <br />Phone: 13031 866-3 56 7 <br />FA%~ (3031 8JD8106 <br />June 11, 1997 <br />iii iiiiiiiiniiiiii <br />999 <br />STATE OF COLORADO <br />~I~ <br />DEPARTMEtJT OI <br />NATURAI <br />RESOURCE' <br />Ruy Romer <br />Governor <br />Ms. Christine Johnston lamess I«n6e~d <br />F=~~~~~„e oimau~ <br />Mountain Coal Company M,~r„ei e ~n„R <br />P. O. Box 591 D17ioi °" eCO' <br />Somerset, Colorado 81434 <br />Re: Minor Revision No. 216 (Ventilation Shaft #3); West Elk Mine; Permit No. C-80-007 <br />Deaz Ms. Johnston: <br />On June O5, the Division found the above-referenced minor revision application to be incomplete <br />for the purposes of filing for the following reasons: <br />1. An appropriate reclamation plan was not submitted for the proposed downcomer pipe <br />associated with ventilation shafr #3. As .-r;th the downcomer pipes proposed for PR#07, <br />the downcomer pipe for ventilation shafr #3 should be fully grouted from surface to total <br />depth at the time of reclamation. The Minor Revision No. 216 application indicates that <br />only the downcomer connection will be sealed. Please submit a revised reclamation plan <br />for the ventilation shaft #3 downcomer pipe, which provides detail on sealing the <br />downcomer pipe with cement grout for its entire length. Reclamation should be consistent <br />with the proposed plan for the two downcomer pipes associated with PR#07. <br />2. Borehole #3 (approved with MR#214) is proposed to contain the downcomer pipe. The <br />reclamation plan for borehole #3 was approved with MR#214 application. The Division <br />approved this reclamation plan with the understanding that borehole #3 will have steel <br />casing cement grouted in place for its entire length. Please verify that borehole #3 will <br />be steel cased for its entire length, fully cement grouted in place. <br />Based on review of [he surface water hydrology and reclamation portions of the application, the <br />Division has the following additional adequacy comments. <br />3. Please revise the permit application narrative to indicate that the MSE wall at the Shafr <br />#3 wall will be permanent. <br />4. The narrative indicates the wall will be on the east side of the pad, but Figure 4 of the <br />supplemental drawings shows the MSE wall on the southwest side. Please clarify this <br />appazent discrepancy. <br />
The URL can be used to link to this page
Your browser does not support the video tag.