My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV88104
DRMS
>
Back File Migration
>
Revision
>
REV88104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:10:21 AM
Creation date
11/21/2007 10:39:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/15/2000
Doc Name
SECTION 02275 GEONET
Type & Sequence
TR33
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Quality convol certificates for test results at the sampling frequency indicated by <br />the Manufacturer's QC Plan shall be submitted. <br />Manufacturing quality control certificates for each shift's production shall be signed <br />by responsible parries employed by the Manufacturer (such as the production <br />manager). <br />The quality control certificates shall include: <br />a. Roll numbers and identification; <br />b. Sampling procedures; and <br />c. Results of the quality control tests verifying each of the properties listed in <br />Table 02275-I. <br />d. Transmissiviry tests do not need to be completed as routine QC tests. <br />However, manufacturer shall include a written statement that the product <br />has been tested and meets or exceeds the transmissiviry requirements. <br />Tests results shall be included. <br />1.05 QUALITY ASSURANCE <br />A. Quality Assurance Plan <br />1. All WORK shall be conswcted, monitored, and tested in accordance with the <br />Manufacturer's Conswction Quality Assurance Plan. The CONTRACTOR and <br />Manufacturer shall participate and comply with all items in the Conswction Quality <br />Assurance Plan. <br />2. CONTRACTOR shall easure that geonet Manufacturer has an internal product <br />quality convol program that meets Contract requirements. <br />3. CONTRACTOR shall be awaze of all activities outlined in the Conswction Quality <br />Assurance Plan, and CONTRACTOR shall account for these activities in the <br />conswction schedule. <br />4. CONTRACTOR shall assure dta[ the geonet is delivered [o the site at least 14 <br />calendaz days prior to installation to allow sufficient time for conformance testing. <br />5. Upon delivery of the geonet, samples of the geonet shall be removed for laboratory <br />testing to ensure compliance with this SPECIFICATION. Conformance sampling <br />and testing shall be performed in accordance with the Manufacturer's Conswction <br />Quality Assurance Plan. <br />6. Geonet rolls that do not meet the requirements of the Manufacturer's Conswction <br />Quality Assurance Plan shall be rejected. CONTRACTOR shall be required to <br />replace [he rejected material with new material that complies with the Manufacturer's <br />Conswction Quality Assurance Plan, at no additional cost to CC&V. <br />1.06 DELIVERY, STORAGE, AND HANDLING <br />A. Packing and Shipping <br />Section 02275 Page 2 of 7 February I5, 2000 <br />Geonet Golder Associates Revision 0 <br />I:\9P~709ln70--$PEC.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.