My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-11-15_REVISION - M1988112 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1990-11-15_REVISION - M1988112 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 12:54:08 PM
Creation date
11/21/2007 10:39:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
11/15/1990
Doc Name
REPORTS TRANSCRIPT OF PUBLIC HEARING VOLUME I APPLICATION OF BATTLE MENT PART 2
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1` <br />217 <br />'1 <br />1 <br />water court <br />ceedin <br />r <br />k <br />i <br />th <br />t <br /> p <br />o <br />gs wor <br />s <br />s <br />you are <br />a <br /> 2 limited to that consumptive use portion, so there <br /> 3 will be no net change in the flow regime of the <br /> 4 creek or the associated aquifer. <br /> 5 The second part of the augmentation plan <br />•~ 6 involves the watering operation at the mine. Water <br /> 7 will have to be pumped from the local aquifer to <br /> 8 allow the minin <br />to commence <br />The water that is <br /> g <br />. <br />' 9 pumped from the aquifer is considered to be <br /> 10 tributary water and, therefore, that -- any <br /> 11 depletions that that creates to Rito Seco will have <br /> 12 to be augmented. And the plan is to augment gnat <br /> 13 water with the consumptive use water from the <br /> 14 Columbian Ranch, so that in time and place, there <br /> 15 will be no depletion to Rito Seco. <br /> 16 That's -- the amount of depletion that <br /> 17 potentially could occur is a matter of monitoring <br /> 18 and understanding, once you start dewatering, of how <br /> 19 much that will be. But the augmentation plan will <br /> 20 put in place, an accounting procedure whereby it can <br /> 21 be evaluated, and if X amount of water is depleted <br /> 22 from Rito Seco, then X amount of water will be put <br /> 23 <br />2 back into Rito Seco. So there are no net depletions <br /> 4 to the creek. <br /> 25 And Z should mention that if,-in fact, <br />,, AGREN, BLANDO 6 BILLINGS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.