Laserfiche WebLink
' 161 <br />1 <br /> 1 We are talking about, you know, 20-acre <br /> 2 l <br />k <br />thi <br />k th <br />t i <br />t h <br />d <br />d <br /> a <br />es or more, an <br />a <br />s a grea <br />azar <br />I <br />n <br />. <br />' 3 I don't think there has been that much other change <br /> 4 in the operation, except that the milling is being <br />' 5 done inside. But the leaching material -- the <br /> 6 leached material part is still on the outside. <br /> 7 It's still -- what is it -- 200 feet up <br />' e off the Rito Seco. And now, you know, we are saying <br /> 9 it has the possibility of also going into the <br />' 30 Culebra, which is a much greater, even a bigger <br /> 11 river than this. <br /> 12 THE CHAIRMAN: Thank you. <br /> 13 Any further questions from the Board? <br />' <br /> 14 Thank you very much. <br /> 15 SISTER CLARA MANHART: Thank you. <br /> 16 MR. COHEN: We have one witness <br /> 17 remaining -- Joe Gallegos. How much time do we <br /> 18 have? <br />' 19 utes <br />THE CHAIRMAN <br />12 <br />i <br />Y <br />h <br /> . <br />ou <br />ave <br />m <br />n <br />: <br />' 20 MR. GALLEGOS: I am here to try to see <br /> 21 if we can get some more bond money out of BMG for <br /> 22 post-mine maintenance, if it's possible, just to <br /> 23 protect people and whatever. <br />' 24 One thin <br />w <br />k f"or i <br />ld lik <br />t <br /> g <br />e wou <br />e <br />o as <br />s, <br /> 25 who is going to maintain the sediment traps that <br />' AGREN, BLANDO & BILLINGS <br />1 <br />