Laserfiche WebLink
<br /> 265 <br /> 1 t <br /> o ensure that there is no erosion at that paint? <br />' 2 UNIDENTIFIED PERSON: That hasn't even <br /> 3 been discussed, because it hasn't been determined <br /> 4 that there are any depletions. I mean, it's <br /> 5 entering an existing channel anyhow. <br />1 6 MR. GOMEZ: Okay. Are you stating, <br /> 7 then, that there will be no dewatering of the <br />1 8 it <br />? <br /> R <br />o Seco <br />' 9 UNIDENTIFIED PERSON: No. We do not <br /> 10 know that. That's part of the augmentation plan, <br /> 11 of determining that, and that's through the gaging <br /> 12 and possibly anything else the State Engineer may <br />' 13 require. <br /> 14 MR. GOMEZ: Does your plan plan to take <br />' 15 b <br />d <br />t <br />f <br />Rit <br />d <br />t <br />th <br />S <br />t <br />b <br /> o <br />e F+umpe <br />wa <br />er <br />rom <br />eco <br />o <br />e use <br />or <br />e <br />o <br /> 16 out of the north pit? <br /> 17 UNIDENTIFIED PERSON: No water is going <br />' 18 to be taken directly from Rito Seco. <br /> 19 MR. GOMEZ: If it -- then how would the <br />' 20 Rito Seco be dewatered then? <br /> 21 UNIDENTIFIED PERSON: There is a local <br />t i <br />l b <br />i <br /> 22 aqu <br />fer there that, if pumped down, w <br />e <br />l <br /> 23 dewatered, and the degree of connection from that <br /> 24 aquifer to Rito Seco is where the depletion will <br />' 25 come in. <br />' AGREN, BLANDO & BILLINGS <br /> <br />