Laserfiche WebLink
i <br />256 <br /> 1 Aft <br />t <br />ti <br />i <br /> q <br />er cons <br />ruc <br />on, are you go <br />ng to do <br /> 2 the same amount of testing? <br /> 3 A There is -- obviously, there is a <br /> 4 secondary level of monitoring which is also <br /> 5 documented in the last submission. I think you <br /> 6 could address that, if you wish. <br /> 7 But in terms of what we are saying is <br />i 8 that <br />as soon <br />th <br />t <br />ti <br />i <br />l <br />t <br />d <br /> , <br />as <br />e cons <br />ruc <br />on <br />s comp <br />e <br />e <br />on <br /> 9 the first phase, the construction monitoring is not <br /> l0 restarted until Phase 2 starts to be constructed, at <br /> 11 which time there will be additional liners placed <br /> 12 and soils will be compacted and (inaudible and in a <br /> 13 similar way. <br /> 14 q You mentioned that the double liner is <br />r 15 not industr <br />standard <br />I <br />it <br />t <br />ti <br />th <br />t -- <br /> y <br />. <br />your <br />es <br />mony <br />a <br />s <br />' 16 could you say that the double liner would be a safer <br /> 17 precaution for this tailings disposal site, even <br /> 18 though it isn't an industry standard? <br /> 19 A When did you stop beating your wife? <br />' 20 q I don't have a wife. <br /> 21 A There is always a decision as to tl~e <br />' 22 rudent level of contai <br />m <br />t th <br />t <br />a <br />t t <br />d <br />t <br /> p <br />n <br />en <br />you w <br />n <br />o a <br />op <br />. <br />a <br /> 23 In terms of water, our primary objective was to <br /> 24 provide a environmentally sound solution for ttis <br />' 25 facility. <br />AGREN, BLANDO & BILLINGS <br /> <br />