Laserfiche WebLink
IJ <br /> 255 <br /> <br /> 1 Q How frequent is this impermeability <br /> 2 testing going to be done and to whom will the <br /> 3 results be given? <br />' 4 Could I elaborate on that a little bit? <br /> 5 Is there something that will be done to prepare for <br /> 6 the annual report for MLRD, and is that the extent <br /> 7 of it? <br /> <br /> 8 A The permeability testing I referred to <br /> 9 was for the construction phase on the (inaudible) or <br /> 10 compacted beneath. The amendment comments of the <br /> 11 responses to some of the questions from the staff <br /> 12 members indicates that it will be done at the same <br /> 13 frequency as the density testing was before. <br /> 14 Now, there is reporting -- from <br /> i <br />i <br />i <br /> 15 report <br />ng funct <br />ons, we have indicated there w <br />ll <br /> 16 be a regular, monthly report in terms of what <br /> 17 construction activities have been. And at the end <br /> 18 of the construction, all the data will be summarized <br /> 19 (inaudible) as an as-built quality assurance, <br />e 20 quality control report which will be submitted to <br /> 21 the agency. <br /> i <br />i <br /> 22 Q is th <br />s then also one of the areas <br />n <br /> 23 which you will be asking for decreased monitoring <br /> 24 rates charged to your monitoring glan? <br />' 25 A Once it's built, it's built. <br /> AGREN, BLANDO 6 BILLINGS <br /> <br />