Laserfiche WebLink
~~ ~ INTERNATIONAL <br />URANIUM ~USA~ <br />CORPORATION <br />Independence Plaza, Suite 950 • 1050 Seventeenth Street • Denver, CO 50265 • 303 628 7798 (main) • 303 389 412.5 (Fix) <br />September 16, 2003 <br />;. <br />Bob Oswald <br />Environmental Protection Specialist <br />Division on Minerals & Geology <br />Department of Natural Resources <br />701 Camino del Rio <br />Durango, CO 81301 <br />Re: St. Jude Mine, Permit M-1978-039 <br />Response to April 2, 2003 Comments <br />Dear Mr. Oswald: <br />International Uranium (USA) Corporation (the "Operator") provides the following information <br />in response to your letter of April 2, 2003 regarding the revised site map and Site Report for the <br />St. Jude Mine, Permit M-1978-039 (the "Permit"). <br />Boundary Change <br />The Operator proposes to modify the permit boundary for the St. Jude Mine Permit M-1978-039 <br />to resolve inadequacies in the existing Permit boundary. A separate letter is submitted herewith <br />to address the proposed boundary change through a proposal for a Technical Revision to the <br />Permit. <br />Updated Site Map: Enclosed for your files are two signed originals of the 1" = 100' updated site <br />map. The updated site map shows the revised Permit boundary as proposed in the Technical <br />Revision request. The site map includes additional information in response to the April 2, 2003 <br />review comments from the Division of Minerals & Geology. Furthermore, additional surveying <br />work has been performed at the St Jude Mine, which resulted in minor additional changes in the <br />site map, most notably a considerable expansion of the topsoil stockpile (described below). <br />Permit Acreage: The Permit acreage of "10.0 acres" listed on the last version of the site map <br />was rounded from our detail AutoCAD drawings. The site boundary has been pulled in a very <br />slight amount on the northeast side, and the area has been recalculated and is below the 10-acre <br />limit for the 110 permit. <br />As noted in the accompanying letter proposing a Technical Revision to adjust the Permit <br />boundary, the Operator is not proposing an expansion of the permitted area. <br />Re~~~~~d <br />avts~n c ~8 t~ ~ Gaoi <br />°8y <br />'~Q.L.E Illl C {1 ~ ~El~l S 1 G ;t/ ~~ 01 <br />Right of Access: The Operator controls unpatented mining claims covering the entire area of <br />mining operations for the Sunday group of mines, including the St. Jude Mine. Since the <br />boundary change proposed by the Operator is so small, no additional map has been provided to <br />show the location of the Operator's unpatented mining claims. <br />