Laserfiche WebLink
Page 122 . <br />ConstructionMateriaLs-Rule 6 <br />this exhibit a statement that conforms to the provisions of Section 34- <br />32.5-103(11)(b), C.R.S.; <br />(b) the estimated depth to which soil, suitable as a plant <br />growth medium, will be salvaged for use in the reclamation process. <br />This description must be consistent with information provided in Exhibit <br />B. Sufficient soil must be salvaged to meet the vegetation establishment <br />criteria of Subsection 3.1.10. If plant growth medium is not reapplied <br />on a graded azea immediately after salvage, then the Operator/Applicant <br />must specify how the topsoil will be stockpiled and stabilized with a <br />vegetative cover until used in reclamation. Plant growth medium <br />stockpiles must be located sepazate from other stockpiles, out of the <br />way of mine traffic and out of stream channels or drainageways. The <br />location of plant growth medium stockpiles must be shown on Exhibit <br />E • Map; <br />(c) specify the thickness of overburden or quantity of waste <br />rock, if any, to be removed to reach the deposit. The location of any <br />overburden stockpiles or waste rock fills must be shown on Exhibit E <br />- Map; <br />(d) specify the thickness of the deposit to be mined; <br />(e) describe the major components of the mining operation <br />such as: roads and access routes, pit, office, shop/maintenance <br />buildings, plant, processing facilities, and any underground openings <br />such as adits or ventilation facilities. These components must be <br />located on Exhibit E -Map; <br />(f) specify the dimensions of any significant disturbances to <br />the land surface such as pit excavations, mine benches, impoundments, <br />stockpiles, waste rock disposal azeas, etc; <br />(g) specify the dimensions of any existing or proposed roads <br />that will be used for the mining operation. Describe any improvements <br />necessary on existing roads and the specifications to be used in, the <br />construction of new roads. New or improved roads must be included <br />as part of the permitted acreage. Describe any associated drainage and <br />