My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-05-21_REVISION - M1984117 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984117
>
2002-05-21_REVISION - M1984117 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:16 PM
Creation date
11/21/2007 10:31:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984117
IBM Index Class Name
Revision
Doc Date
5/21/2002
Doc Name
Receipt of Completeness Response Package (s/b M-1984-117)
From
DMG
To
Fremont County
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 121 <br />Construction Materials Rule 6 <br />Items (a)-(c) below must be addressed to the extent necessary to demonstrate <br />compliance with the applicable performance standard requirements of Rule 3. <br />At a minirnum, the Operator/Applicant shall include the following information: <br />(a) a description of the vegetation and soft characteristics in <br />the azea of the proposed operation. The local office of the Soil <br />Conservation Service (SCS) may provide you with this information as <br />well as recommendations for Exhibit D -Reclamation Plan; <br />(b) identify any permanent man-made structures within two <br />hundred (200) feet of the affected azea and the owner of each structure. <br />Each swcture should be located on Exhibit E -Map; <br />(c) a description of the water resources in the area of the <br />proposed operation. Identify any streams, springs, lakes, stock water <br />ponds, ditches, reservoirs, and aquifers that would receive drainage <br />directly from the affected azea. Provide any information available from <br />publications or monitoring data on flow rates, water table elevations <br />and water quality conditions; and <br />(d) Awildlife statement prepared by the Colorado Division <br />of Wildlife (DOW) is not required for 111 Special Operations, or 110, <br />or 110(6) Limited Impact Operations. The Operator/Applicant may <br />contact the local Colorado Division of Wildlife (DOW) representative <br />to verify that no critical or important wildlife habitats or wildlife species <br />will be impacted by the proposed operation. <br />6.3.3 EXHIBIT C -Mining Plan <br />The purpose of the mining plan is to describe how mining will affect the permit <br />area for the duration of the operation. This plan must be correlated to Exhibit <br />E -Map. The description of the mining plan must be adequate to satisfy the <br />requirements of Section 3.1 and demonstrate compliance with Rule 3. At a <br />minimum, the Operator/Applicant must include the following information: <br />(a) specify the estimated dates that mining will commence <br />and end. If the operation is intended to be an intermittent operation as <br />defined in C.R.S 34-32.5-103(11)(b), the Applicant should include in <br />
The URL can be used to link to this page
Your browser does not support the video tag.