My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-05-16_REVISION - M1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981022
>
2005-05-16_REVISION - M1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:36:07 PM
Creation date
11/21/2007 10:27:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981022
IBM Index Class Name
Revision
Doc Date
5/16/2005
Doc Name
DMG Reclamation Cost Estimate
From
DMG
To
Connell Resources Inc
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost E stimating Sof tware <br /> BULLDO ZER WORK <br />PROJECT IDENTIFICATION <br />Task# 007 <br />State Cul:vado <br />Pormivjob# M-1981-022 <br />Date : 0`~1fir2005 County a_admer Abbreviation :none <br />User : ESC Site :Glass Gravel P# Filename :M022-007 <br />Agency or organ'vation name : DMG <br />Permit or other job action : AM-02 <br />task doscnption Back/ill 8 Grade 3 acres <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cut 08R Series ll • 8SU Horsepower : 3f0 <br /> Blade type : Samr-Wvversaf <br /> Attachment no. t : BOPS Cob Shift bests : f prix day <br /> Attachment rw. 2 : 3•shonk upper <br /> Data source : (CRG) <br /> Utilization °k <br />5'Q~Breaktlown ; Ownership cosVhour : 548.82 NA <br /> Operating cosUhour : 569.40 100 <br /> Ripper op. cosL'hour : 50.00 0 <br /> Operator cosL'hour : 531.78 NA <br /> Total unit cosvhour 5150.00 Total float cosUhour $150.00 <br />MATERIAL QUANTITIES <br />tniv:d Swell LoosO <br />volume - 58.000 LCY factor NA volume 58,000 l-CY <br />HOURLY PRODUCTION <br />Average push distance : 200 foal Malenal consistency : f.00 (Cat HB) <br />Unadjusted hourly production : 49L 9 LCY/hr Dozing method : 1.00 (gen.) <br /> V+srbillty : 1.00 /a v9 ) <br />Material consistency description : Job efficiency : 0.83 t 1 shdVda} <br />Consokdafed stockpile Spoil pile : 0.80 (fid-rf) <br /> Push gratllent : 1.U0 fCat HB) <br />Average push gradient : 0.00 % (pas) Altitude 1.00 (Cat HB) <br />Average silo altitude : 5.000 feat Malarial weight : 0.79 (Cat H9) <br /> Blade type . 1,00 (S/SU/U} <br />Material weight : 2.900 Ibs1LCY Net correction : 0.39 <br />Weight doscripbon <br />Decomposed rock • 50% Rock, 50% Eadh Adjusted unit produellon 1 `+~ 71 LCYlhr <br /> Adjusted fleet production 194.21 LCYRv <br />JOB TIME AND COST <br />Fleet size : f Dozers) TOlal job time 298.64 Hours <br />Umt cost : 50.772 /LCY Total job cost $44, 797 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.