Laserfiche WebLink
<br />HOURLY PRODUCTION shoat 2 of ?. <br />Haullna Capacity <br />Scraper Payload (weight) Basis : <br />Scraper Bowl (volume) 8asls <br />Material weight : 2,800 pounds/LCY Struck volume : 14.OU LCY <br />Material doscnpuon : Hooped volume 20 00 LCY <br />Clay ~ Nahual bed Average volume : 17 OU LCY <br />Rated payload : 48,000 pounds Adjusted capacity : 17.00 LCY "' <br />Payoad Capacity : l7. 14 LCY ••• kxn'y PrPlucrnr renecis vowma ias s: raprx pmr o• . ~,n.;,,n mode~a <br />Cvclo Timo : Job Condition Corroctlona : Site altitude (ft.) : 5.000 <br /> Srmpor I Push dolor Sourco <br />Scraper loading time' . 1.50 minutes Altitude adj.:, i 000 NA (Cat H8) <br />Manouver and spread limo : 0,60 minutes .lob efficiency : 0.830 NA <br />- (Cat HB)_ <br />' ~o~r; uny per ecroper pair an puM~pu11 moanie Not CerroClien : 0.830 NA <br />minutes <br />Return route : _ <br />1 800 -2.00 5.00 3.00 2874 0.33 <br />r - i - <br />-- ' <br />"travel pmo WrmM eepmentkeO~uetrd br aCC6lMtlorVOatdaratldt Retum limo: 0.33 minutes <br />Total scraper team cycle limo (load ~ haul • maneuver and sproad ~ return) : 2,90 minutes <br />Unadjusted unn producUOrohour 351.82 LCYlhour "' Adjusted for job conditions : 292. U I LCYlhour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjustod single scraper team (unit) hourly production : SH4 U2 LCY/hour <br />Adtusted multiple scraper foam (geeq hourly production 584.02 LCYlhour <br /> <br />JOB TIME AND COST <br />Heat sve ~. t Team(s) Total job limo 61.64 Hours <br />Unrt roa ~ 37.100 ;LCY Total jab cost 539,811 <br />Travel limo : <br />Road conditbn doscrlption :Rutted dirt, IdUo molntonance, no water, 2" 1xo penefraflon <br />