Laserfiche WebLink
ROADABLE~EQUIPMENT sheet 2 of 2 <br /> Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 1.00 1.00 Total non-roadable mob/demob cost' <br />Return time (hours) = 1.00 1.00 'two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cast " <br />Unloading time (hours) = 0.50 NA "one round trip, no haul rig <br />Subtotals = 3.00 ~ 2.00 <br />Naturita <br />40.0 miles <br />40.0 mph <br />$1,959.93 <br />$0.00 <br />JOB TIME AND COST Total job time : 6.00 hours <br />Total job cost : $1.960 <br />EQUIPMENT HAUL DISTANCE and TIME <br />