Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :DBMS <br />Task # : 007 State :Colorado PermiUjob # : M-1977-416 <br />Date :09/19/2006 County :San Miguel Abbreviation :none <br />User : RCO Site :Carnation Mine Filename :M416-007 <br />Permit or other job action :Final Reclamation (Tr-Ol) <br />Task description :HBUI I@Claf77dtlOll @gUlpm@Ilt f0 Blld ffOm Slt@ <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per da <br /> y <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Genedc folding gooseneck, drop deck equipment trailer (25T, 50T, and 100Tj <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $16.63 $18.37 $22.33 <br /> Operatingcost/hour: $44.38 $46.13 $50.07 <br /> OperatorcosUhour: $27.66 $27.66 $27.66 <br /> Helper cosUhour: $0.00 $25.39 $25.39 <br />__,__„__,_„ ............................... Total UnitCosUhour: $88.67 $117.55 $125.45 <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(NO. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />CosUfleet <br />-Cat D6R LGP - 6S (2003) 28.39 $28.55 $117.55 1 $146.10 $117.55 $0.00 <br />-CAT 908 6.66 $9.09 $88.67 1 $97.77 $88.67 $0.00 <br />-Reveg equipmt 10.00 $10.00 $88.67 1 $98.67 $88.67 $0.00 <br />sheet 1 of 2 <br />Subtotals :~ $342.54 ~ $294.89 <br />