Laserfiche WebLink
6) A Spill Prevention Control and Countermeasure (SPCC) Plan has been prepazed by Greg <br />Lewicki and Associates for the Anderson Pit mining operation. A copy of the plan is kept on site <br />in the Redi-Mix Plant office. In addition, the portable crusher and asphalt plants that will be on <br />site from time to time each have their own sepazate SPCC Plans. <br />7) No USCOE 404 permit will be necessary because no wetlands or waters of the U.S. will be <br />disturbed. <br /> <br /> <br />Anderson Pit, April 07 M-2 <br />