Laserfiche WebLink
. across the easement upon completion of mining for future use therefore; the access road will <br />remain after mining has been completed. A letter stating such has been included in Appendix A. <br />l_.J <br />The road which will be used to gain access to the site is shown on Maps C-1, C-2 and F. The <br />access road is approximately 30 feet wide and encompasses an azea of approximately 1.11 acres. <br />United Companies is also working with Union Pacific Railroad and the Colorado Department of <br />Transportation to install an automated crossing of the train tracks with 1800 Road and to add <br />acceleration and deceleration lanes to State Highway (SH 92). The existing crossing has stop <br />signs only. <br />No explosives will be used in conjunction with the mining and reclamation operation. <br />2. Mining Timetable <br />The following timetable is a best estimate of the sequence of operations for the life of the mine <br />and is based on mining an average 266,667 tons of gravel per yeaz. <br />Table D-4 <br />Task # Description Time Needed <br />Months <br />1 Mine Phase 1. 52.6 <br />2 Reclaim Phase 1 and mine Phase 2. 61.4 <br />3 Reclaim Phase 2 and mine Phase 3. 41.2 <br />4 Reclaim Phase 3 and mine Phase 4. 78.0 <br />5 Reclaim Phase 4 and mine Phase 5. 66.4 <br />6 Reclaim Phase 5 and mine Phase 6. 35.2 <br />7 Reclaim Phase 6 and mine Phase 7. 53.5 <br />8 Reclaim Phase 7 and mine Phase 8. 48.6 <br />9 Reclaim Phase 8 and mine Phase 9. 55.1 <br />10 Reclaim Phase 9 and mine Phase 10. 61.2 <br />11 Reclaim Phase 10 and mine Phase 11. 76.0 <br /> Total months 629.0 <br /> Total years 52.4 <br />Anderson Pit, Apri107 D-6 <br />