My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-23_REVISION - M1995056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995056
>
2007-05-23_REVISION - M1995056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:14 PM
Creation date
11/21/2007 10:14:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995056
IBM Index Class Name
Revision
Doc Date
5/23/2007
Doc Name
Cost Summary Form
From
DRMS
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 05/16/2007 <br />User : KAP <br />State :Colorado <br />County :Archuleta <br />Site :Weber Pit No 2 <br />PermiUjob # :M-1995-056 <br />Abbreviation :none <br />Filename : M056-005 <br />Agency or organization name :Colorado Division O(Reclamation <br />Permit or other job action :Amendment <br />Task description :Place Rip Rap in <br />HOURLY EQUIPMENT COST <br />Horsepower: 55 <br />Weight (MT) : 6.49 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $15.06 NA Shift basis : 1 per day <br />Operating cosUhour : $15.51 100 Data source : (CRG) <br />Operatorcost/hour: $32.96 NA <br />Total unit cosUhour : $63.53 Total fleet cosUhour : $63.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : - 224 LCY factor : NA volume : 224 LCY <br /> <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket swing loaded dump bucket swino empNl <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.24 minutes <br />Bucket Capacity <br />Rated bucket capacity : 0.20 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.45 Rock -Poorly blasted (40% - 50%) <br />Adjusted bucket capacity : 0.09 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,560 feet Altitude adjustment : 0.87 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shiff/day) <br />Net job correction : 0.72 multiplier <br /> <br />Unadjusted hourly unit production : 22.31 LCY/hour <br />Adjusted hourly unit production : 16.11 LCY/hour <br />Adjusted hourly fleet production : 16.11 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 13.90 hours <br />Unit cost : $3.943 per LCY Total job cost : $883 <br /> <br />And <br />Ditches <br />Machine description :Cat 307C <br />
The URL can be used to link to this page
Your browser does not support the video tag.