Laserfiche WebLink
CIRCES Cost Estimating Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task#: 005 State :Colorado Permit/job#:M-1995-056 <br />Date: OS/1B/2007 County:Amhuleta Abbreviation:none <br />User: KAP Site :Weber Pit No 2 . Filename ~ M056-005 <br /> <br />Agency or organization name :Colorado Diw'sibn OfReclamafion Mining And Safety <br />Permit or other job action :Amendment <br />task description :Install Rip Rap in Drainage Ditches <br />HOURLY EQUIPMENT COST Basic machine: CAT 950G (2002) Horsepower : 180 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Daly source : (CRG) <br /> Utilization <br />Cosi Breakdown: Ownership cosUhour: $24.50 NA <br />Operating rgstlhour: $29.21 100 <br />Operator cosUhour: $32.78 NA <br />Total unit cosUhour : $83.49 Total fleet cosUhour . $$3,49 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume: 224 LCY fadoc NA volume: 224 LCY <br />Source of quantity take-off :Reclamation Plan <br />Source Of estimated swell factor: NA <br />HOURLY PRODUCTION ~ (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.550 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material: Mate/ia/6"and over dlamefer 0030 (Cat HB) <br />Stockpile : Dumped by truck 0.020 (Ca[ HB) <br />Truck ownership: NO ad/ustment-factor not applicable 0000 (Cat HBJ <br />Operation : COnsfan(operation -0.040 (Car HBJ <br />Dump target Nominal target 0.000 (Cat HBJ <br />Net cycle time adjustment : 0.010 minutes <br />Adjusted basic cycle time : 0.560 minutes <br />Roll'no Res'stance -Road Cond Eons <br />Haul :Soft, rutted did, no maintenance or water, 4" the penetration <br />Return :Soft, rutted dirt, no maintenance or wafer, 4"n're penetration <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. Total res. Travel time <br />- (%) (%) (minutes) I Data <br />Source <br />Haul route: 300 10.00 6.00 18.00 0.6762 (Cat HB) <br />Return route: 300 -10.00 8.00 -2.00 0.2543 (Caf HS/ <br />Loader Bucket Capacity <br />Total travel time : 0.9325 minutes <br />Total cycle time : 1.493 minutes <br />Rated capacity : 3.75 LCY (heapetl) (Cat HB) <br />Bucket Ell factor 0.825 Blasted rock-avg. blasted (75-90%J <br />Adjusted capacity: 3.09 LCY <br /> Source <br />Job Condition Correcfon Factors Altitude adjustment factor : 7.00 (Cat HB) <br />Site altitude: 7,560 feet Job elfciency factor: 0.83 (l shift/day) <br /> Net correction: 0.83 multiplier <br />Unadjusted hourly unilproduction : 124.37 LCYJHr <br />Adjusted hourly unit production : 103.23 LCY/Hr (Cat HB/ <br />Adjusted hourly Fleet production: 103,23 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 2.17 Hours <br />Unit cost: $0809 /LCY Total job cost: $181 <br />