My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-04-02_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-04-02_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 3:54:55 PM
Creation date
11/21/2007 10:13:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/2/1992
Doc Name
PN M88-112 TR 4
From
BATTLE MOUNTAIN GOLD CO
To
MLRD
Type & Sequence
TR4
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />.: .:.. = <br />-... - <br />- - <br />Page 17 <br />savings were attributed to the addRlonal gdd recovery Idlowing cyanide recovery. These values are quRe <br />' consistent wRh those anticipated at the Gdden Cross Mine. <br />SlmGar cost estimates were recently completed for two existing mining operations In the Unfted States. The <br />first mine Is a 15,000 ton/day operation exhlbtling a slurry flow of about 5,000'gpm and a tree ~yanlde level <br />t of 125 mg/I. The estimated capital and opAra(Ing costs were 53,500,000 and 50.31/ton of ore processed, <br />respectively. A summary of the costs are.pre~ented In Tables 13 end 14. Using a cost of 50.70~'Ib for NaCN <br />and a 9096 recovery, the recoverable value of cyankJe was about 50.59/ton. The net recoverable value was <br />' about 50.28/ton or 51,200/day. These calculations dkl not take Into account either the mass of cyankle <br />present In the recyded and untreated decant water, or the royalty fee. The corresponding op@rating costs <br />for chemical treatment would have ranged from about 51.00-51.50/ton. <br />' - -- -- <br />L TABLE 13 <br />' ESTIMATED CAPITAL COST FOR CYANIDE RECOVERY <br />1 <br /> <br /> <br /> <br />'. •>', <br /> <br /> <br /> <br /> <br />1 <br />Item Total Cost ,~ <br />Stripping Towers 5 125,000 <br />Absorber Towers 125,000 <br />Tower Internals <br />Demisters 100,000 <br />Distributers 100,000 <br />Support Gratings 50,000 <br />Packing 250,000 <br />Reactors 100,000 <br />Mixers 60,000 <br />Fans 75,000 <br />H,SO~ Feed System + Storage 50,000 <br />Ume Feed System + Storage :105,000 <br /> <br />NaOH Feed System + Storage ~; <br />20.000 <br />Subtotal Equipment Costs 51,160,000 <br />Installation Factor x 3.0 <br />TOTAL CAPITAL COST 53,480,000 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.