Laserfiche WebLink
..: <br />i ~- <br />1 <br />' Pape 15 <br />TABLE 12 <br />CYANIDE DECAY IN ENTRAINED LIOUOR FLOLLOWING CYANIDE RECOVERY t't <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br />1 <br />Parameter nRl 1 Week .-;;2 Weeks 4 Weeks ' _ 8 Weeks 2~ ,Weeks <br />pH 102 9.7 <br />~ ~ '' 9.1 9.8 9.8 9.3 <br />SO4 2525 2525 2580 2530 2370 2390 <br />Ca - 858 858 858 858 808 805 <br />Total hardness 2140 2140 '2140 2140 2013 2008 <br />(as CaCO,) <br />Total CN 29.4 29.4 3i.3 25.5 27 26 <br />WAD CN 6.8 6.6 5.5 3.8 2.1 1.51 <br />Cd 0.1 <0.01 <0.01 <0.01 <0.01 <D.Ot <br />CO 0.33 0.25 0.2 ---- -- -- <br />Cu 6 4.3 2.9 2.1 0.63 D.16 <br />Fe 8.7 8.9 9 9.3 9.3 B.5 <br />Zn 0.01 0.03 0.01 <0.01 0.01 0.01 <br />Pb <0.1 <0.1 <0.1 <0.1 - -- <br />Mn 0.02 0.02 <0.01 0.01 0.02 0.02 <br />Ag 0.04 0.01 0.01 0.02 0.02 0.02 <br />Cr 0.02 ---- ---- <0.02 --- --- <br />Hg 0.0002 <0.0001 <0.0001 <0.0001 -- --- <br />CYANIDE DECAY IN TAILINGS DECANT FOLLOWING CYANIDE RECOVERY t't <br />Exposure 71me BFI T tai tr WAD Pf <br />Initial 10.2 29.4 6.8 <br />1 day B.0 29.4 ---- <br />3 days 8.2 30.0 ---- <br />7 days 8.3 30.0 ---- <br />14 days 8.0 31.9 ---- <br />28 days 7.3 32.0 0.33 <br />t'~ All values In mg/I, unless otherv+ise stated. <br />The results of the laboratory end pilot plant Investigations have proven the vtabilRy of the Cyanltsorb Process <br />for recovery of cyanide }rpm slurries. In addRion to the recovery of cyanide, there were further <br />environmental advantages retating to the disposal of fallings and the potenC~al (or groundwater <br />contamination. The next section of the paper examines the economic aspects of cyanide recovery from <br />solutions and slurries. <br />ECONOMICS OF CYANIDE RECOVERY PROCESSES <br />In apptlcations where treatment of tailings prior to disposal Is warranted, there are sevetal economic <br />advantages to cyanide recovery systems. First, the operating costs associated with chemical treatment are <br />eliminated, while second, a useful and expens(ve reagent (i.e. cyanide) Is recovered. The cost recovery <br />more than offsets the cost of the cyanide recovery system. Third, the cyanide recovery systenns are simple <br />in design and operation, thereby minimizing operator requirements end the degree of automated contrd. <br />