My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-01-20_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
1998-01-20_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 11:52:15 AM
Creation date
11/21/2007 10:11:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
1/20/1998
Doc Name
HENDERSON MINE & MILL PN M-77-342 AMENDMENT
From
CLIMAX MOLYBDENUM CO
To
MLRB
Type & Sequence
AM3
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• using survey information after completion of the stockpile activities. Adequate <br /> storage capacities exist for the expected volumes. <br /> • Topsoil stockpiles will be graded to slopes no greater than 3H:1V in <br /> contoured configurations within one month of the topsoil salvage operation. <br /> Drainage will be constructed around the stockpiles to prevent erosion. <br /> • Interim seeding will be conducted on the topsoil stockpiles as described <br /> herein. <br /> • Topsoil stockpiles have been located where rehandling is unlikely for the life- <br /> of-mine. Topsoil stockpiles will be identified on site maps and signed so as to <br /> prevent disturbance and mishandling. <br /> • 3.5.3 Corridor Excavation <br /> Excavation of the PC3 Conveyor corridor will be within the footprint identified on <br /> the Reclamation Plan Map (Exhibit C). Excavation will be conducted using <br /> heavy equipment selected by the contractor and is likely to include large dozing <br /> equipment, hoe excavators, and possibly scraper equipment. Blasting is <br /> foreseen as a requirement for several areas along the conveyor route. <br /> Compaction equipment will be needed to configure appropriate foundations and <br /> road subgrades. <br /> 3.5.4 Post Construction Slope Configurations <br /> Design parameters for slope configurations on cut and fill banks along the <br /> conveyor route are as follows: <br /> • . Bedrock Materials -- No greater than 1 H:1V <br /> AO <br /> iwe <br /> 19 <br /> January 16.1998 <br /> Pond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.