Laserfiche WebLink
• the Permit discuss two primary objectives of stabilization and revegetation. <br /> Concurrent reclamation, where possible, will ensue and final reclamation will be <br /> completed at life-of-mine. <br /> Reclamation goals for the post-mining land uses in Section 3.1 herein are <br /> directed toward revegetation efforts that meet or exceed DMG requirements. <br /> Prescriptive revegetation plans for the PC3 Conveyor corridor are required under <br /> Rule 3.1.10 to meet performance standards for cover based on assessment of <br /> surrounding vegetation. The presence of mature stands of timber over the <br /> majority of land affected by construction of the PC3 Conveyor require <br /> reclamation that obtains plant growth and cover representative of stands in <br /> earlier successional stages of forest growth. <br /> This Plan covers natural and probable successional forest stand development <br /> • following disturbance, facility demolition, grading, seeding, fertilization, and <br /> maintenance activities. Interim and final reclamation is outlined to provide <br /> opportunity for statistical comparison of reclaimed ground to similar disturbed <br /> and undisturbed lands. Technical and/or reference standards upon which <br /> Climax Molybdenum Company will base determinations of revegetation <br /> consistent with Rule 3.1.10(1) are subject to future discussions between Climax <br /> Molybdenum Company and DMG. <br /> The Henderson conveyor corridor can be divided into three distinct sections. <br /> The Plan, as it pertains to these sections, is described below: <br /> 3.2.1 Henderson Portal to PC2 Drivehouse <br /> This section of the Henderson 2000 project resides along the existing Henderson <br /> railroad grade. The section is listed as Area 4 in the Permit. Reclamation <br /> [MEN <br /> 11 <br /> J.ary 16.1996 <br /> Plan.dw <br />