Laserfiche WebLink
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER _ of cow <br />Division of Water Resources .s <br />e <br />~ <br />Department of Natural Resources y <br />/ <br />~ <br />1313 Sherman Street, Room 818 ~ ~ <br />k <br />~ <br />'te~s ` <br />Denver, Colorado 80203 Res onse to Reclamation Permit A lication Consideration <br />Phone (303) 866-3581 P PP <br />FAX (303) 866-3589 Bill Owens <br />www.watecstate.co.us Governor <br />DATE; December 24, 2002 Greg E. Walther <br /> Execud~e Director <br />TO: Carl B. Motmt, Senior Environmental Protection Specialist Hal D. Simpson, P.E. <br /> SCate Engineer <br />CC: Division 5 Office; William McEwen, District 37 Water Commissioner <br />FROM: Craig M. Lis, P.E.~~a~~ <br />RE: Operator: Lafarge West, Lzc., Chambers Pit, File No. M-80-136, AM-1 <br />Section 31, Twp 4 S, Rng 84 W, 6th P.M., Eagle County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a pemut, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit azea. The applicanC must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the pemrit area or contact this office regazding the <br />600 foot spacing notification(hearing process. <br />^ The proposed operation may have potential impact on existing water rights near [he project location, Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />^ The applicant has indicated plans to use other Water for:uses at [he permit site, _storage in the excavated <br />area(s). The applicant will need to provide evidence to this office that the water is permitted or decreed for such <br />uses. <br />® Other: The original application indicates that a pond will be created in Area A, but provided no information <br />concerning the water source for this pond. If this pond intercepts ground water, a well permit and an <br />augmentation plan are required. Please have [he applicant provide this office with the well permit number and <br />Case Number far the plan for augmentation, or verification that the pond does not intercept ground water. The <br />applicant must also provide this office with the water source(s) for al] water use(s) associated with this mining <br />permit. <br />