My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-01-21_REVISION - M1998013 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998013
>
2003-01-21_REVISION - M1998013 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:13 PM
Creation date
11/21/2007 10:08:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Revision
Doc Date
1/21/2003
Doc Name
DRAFT Slurry Wall Construction Specifications
From
Tetra Tech
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.11 QUALITY CONTROL <br />The Contractor shall maintain his awn quality control for the cut-off wall construction under the <br />direction of a qualified Engineer. Testing requirements are summarized in Table 1 and specified <br />herein. <br />3.12 TRENCHING CONTINUITY AND KEY <br />The Contractor shall be responsible for demonstrating to the satisfaction of the Engineer that the <br />trench is continuous and keyed into the bedrock surface. Trench continuity shall be assured by <br />the action of movement of the trench excavation equipment such that the digging tools can be <br />passed vertically from top to bottom of the trench as well as moved horizontally along the axis of <br />the trench without encountering unexcavated material. Penetration of the bottom of the trench <br />into the bedrock shall be demonstrated by observation of the cuttings removed from the trench <br />and the action of the excavating tools on the bedrock surface. <br />3.13 SLURRY AND BACKFILL <br />Testing requirements for slurry and backfill are as follows (and aze outlined in Table 1): <br />A. Materials <br />Bentonite: Certification of compliance with the specifications shall be obtained <br />from the material manufacturer. <br />2. Backfill Mix: Backfill material shall be tested prior to placement in the trench by <br />conducting tests to determine slump and gradation. Testing frequency will be as <br />directed by the Engineer with a minimum of one series of tests per 200 cubic <br />yards of backfill material prepared for introduction in the trench. <br />B. Slurry Introduced in the Trench <br />A complete series of tests shall be conducted on slurry from the pond containing slurry <br />ready for introduction in the trench at least once per shift or each time a pond is prepazed. <br />The tests shall include: <br />- pH of the slurry, <br />- Unit weight of the slurry, <br />- Filtration loss of the slurry, and <br />- Viscosity of the slurry. <br />C. Slurry in the Trench <br />Slurry in the trench shall be tested at least once per shift. Samples shall be obtained from <br />near the bottom of the trench neaz the point of trenching and tested for unit weight and <br />sand content. <br />END OF SECTION <br />Draft -Technical Specifications <br />Ol /99 Section 02168 -Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.