Laserfiche WebLink
DIVISION 2 -SITE WORK <br />SECTION 02100 -SITE PREPARATION <br />PART 1 -GENERAL <br />1.01 WORK INCLUDED <br />Clearing trees and brush from the slurry wall alignment and stripping upper soil layer to prepaze for <br />placement of new impervious fill. <br />1.02 RELATED WORK <br />Section 02290 - Fil] Area Construction <br />PART 2 -NOT USED <br />PART3-EXECUTION <br />3.01 GENERAL <br />The Contractor shall, by their own investigation, determine the extent and effort of clearing required <br />in accordance with this section. <br />3.02 CLEARING AND GRUBBING <br />Clearing of the ground surface along the slurry wall alignment and in fill aeeas will be at the <br />direction of the Engineer. The area to be occupied by the permanent construction required under <br />these specifications and the surfaces of all borrow pits, stockpiles, and fill areas shall be cleared of <br />all trees, stumps, exposed roots, brush, rubbish, and other objectionable matter as determined by the <br />Engineer. <br />3.03 STRIPPING <br />The fill areas shall be stripped to a depth of 6 inches or to a sufficient depth, as determined by the <br />Engineer, to remove all unsuitable materials. The unsuitable materials to be removed by stripping <br />shall include all surface boulders and loose rock, debris, topsoil, vegetable matter, including stumps <br />and roots, and all other perishable and objectionable materials that aze unsuitable for use in <br />permanent construction required under these specifications or that might interfere with the proper <br />bonding of the embankment with the foundation, or the proper compaction of the fill materials, or <br />that may be otherwise objectionable as determined by the Engineer. <br />3.04 DISPOSAL <br />Materials from clearing operations shall be removed from the construction site or otherwise disposed <br />of as approved by the Engineer. <br />Waste piles shall be located where they will not interfere harmfully with the natural flow of the <br />stream and drainage channels, with construction operations in the borrow aeeas, or with the operation <br />of the reservoir. Waste piles shall be leveled and trimmed to reasonable regular lines. <br />END OF SECTION <br />Draft-Technical Specifications <br />01/99 Section 02100 -Page 1 of I <br />