Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br /> Agency or organization name : DMG <br />Task # : 12a State :Colorado <br />Date : 01/20/2006 County :Garfield <br />User : SSS Site :Logan Wash <br /> <br />Perm it or other job action : SL-Ol <br />Task description :Rep/ace 6" topsoil on roads w/outslope not pulled back <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Equipment Description <br />Truck/loader team -Track :Generic 8-f0 cy, 6x4 <br />-Loatler :Cat 3458 L - VG Series ll <br />Support equipment -Load area : NA <br />-Dump area :Cat D6R LGP - 6S <br />Road maintenance -Motor grader : NA <br />-W afar tmrk t NA <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Loatl Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 excavate NA dozer NA NA <br />Utilization-machine : 100 98 NA 100 NA NA <br />-Ripper attachment: NA NA NA 0 NA NA <br />Ownership cosVhour: $12.25 $50.69 NA $27.20 NA NA <br />Operating cosUhour: $19.20 $56.30 NA $38.92 NA NA <br />Ripper op. cosUhour : NA NA NA $0.00 NA NA <br />Operator cosUhour : $21.75 $31.97 NA $31.78 NA NA <br />Unit subtotals : $53.20 $138.95 NA $97.91 NA NA <br />Number of units : 7 1 0 1 0 0 <br />Group subtotals : Work : $511.36 Support : $97.91 Maintenance : $0.00 <br />Total work team cosUhour <br />MATERIAL QUANTITIES <br />Initial Swett Loose <br />volume: 2,218 LCY factor: NA volume <br />Source of quantity take-off : TR-07 <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost <br />HOURLY PRODUCTION <br />Truck CaaaciN <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 1,600 pounds/LCY Struck volume <br />Descr.: Top Soil Heaped volume <br />Rated payload : 27,280 pounds Average volume <br />Payload capacity : 17.05 LCY Adjusted volume': <br /> Final truck volume based on number of loader passes <br /> -truck volume adjusted io not exceetl rated payload or heaped voNme <br />Loadino Tool CaoaciN : Job Condition Corrections <br />Rated capacity (nom. heaped) : 2.990 LCY Truck <br />Descr.: Other -moist loam (100-110%) Altitude adj.: 0.970 <br />Bucket till factor : 1.050 Job efficiency : 0.830 <br />Adjusted bucket capacity : 3.140 LCY Net correction : 0.805 <br />PermiUjob # : M-1977-424 <br />Abbreviation :none <br />Filename : M424-12a <br />$609.27 <br />2,218 LCY <br />8.00 LCY <br />10.00 LCY <br />9.00 LCY <br />10.00 LCY <br />9.41 LCY <br />Site altitude (ft.) : 7, 750 <br />Loader Source <br />1.000 (Cat HB <br />0.830 (1 shiff/da <br />0.830 <br />