My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-01-23_REVISION - M1977424
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977424
>
2006-01-23_REVISION - M1977424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:23:00 PM
Creation date
11/21/2007 10:07:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Revision
Doc Date
1/23/2006
Doc Name
Release Approval Cost Est. Recalc and Request for Evaporation Pond
From
DMG
To
Occidental Oil Shale Inc.
Type & Sequence
AR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Task#: 11a <br />Dafe : 01/20/2006 <br />User: SSS <br />State :Colorado <br />County :Gaffe/d <br />Site :Logan Wash <br />Agency or organization name : DMG <br />Permit or other job action : SL-Ol <br />Task description :Rip and grade 2.75 acres of roads where pulling up outslope is not requ <br />_ __.. _ I <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 16H Horsepower : 275 <br />Attachment no. 1 : NA Shift basis : 1 per day <br />Attachment no. 2 :Multi-shank ripper <br />Cost Breakdown <br /> Utilization <br />Ownership cosUhour : $54.36 NA <br />Grader operating cosUhour : $57.02 100 <br />Ripper operating cosUhour : $2.06 50 <br />Operator cosUhour : $31.97 NA <br />Total unit cosUhour : $145.42 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 2.75 <br />Source of estimated acreage :estimate from <br />HOURLY PRODUCTION <br />acres <br />PermiUjob # : M-1977-424 <br />Abbreviation :none <br />Filename :M424-i1a <br />Selected application :Ripping (0-3 mph) <br />Average grader speed : 1.50 mph <br />Selected blade angle : NA degrees' <br />Effective blade length : NA feet <br />Width of blade overlap per pass : NA feet <br />Net grading or ripping width per pass : 9.75 feet" <br />Unadjusted hourly unit production : 1.7727 acres/hour <br />Job Condition Correction Factors <br />Average site altitude : 7, 700 feet <br />' at 0 degrees. blade is perpentlicular <br />to direction of travel. <br />"width of ripper beam on ripping applications <br />$145.42 <br />i <br />Source <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency adjustment factor : 0.85 (1sh/d, mod.) <br />Net job correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.5068 acres/hour <br />Adjusted hourly fleet production : 1.5068 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) <br />Unit cost : $96,51 per acre <br />Total job time <br />Total job cost <br />1.83 hours <br />$265 <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.