My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-30_REVISION - M1985219
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985219
>
2002-07-30_REVISION - M1985219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:12 PM
Creation date
11/21/2007 10:07:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985219
IBM Index Class Name
Revision
Doc Date
7/30/2002
Doc Name
Reclamation Cost Estimates for AM-01 and current conditions
From
DMg
To
Milton Derrick
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Agency or organization name : DMG <br />Task # : 001 q State :Colorado <br />Date : 07/25/2002 County :Mesa <br />User : GRM Site :32 Road Pit <br />sheet t of 2 <br />PermiUjob # : M-1985-219 <br />Abbreviation :none <br />Filename : M219-001 <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description :Beck Fill West Slope O/Current Slope <br />HOURLY EQUIPMENT COST <br />TruckAoader team -Truck <br />-Loader <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : ruck/Loat <br />Truck <br />Import data filename: truck2 <br />Utilization-machine : 100 <br />-Ripper attachment: NA <br />OwnershlpcosUhour: $12.60 <br />Operating cost/hour : $17.44 <br />Ripper op. cosVhour : NA <br />Operator costlhour: $24.14 <br />Unit subtotals : $54.28 <br />Number of units : 2 <br />sdc 8-fOCy 6x4 <br />950G high lift <br />lork Team <br />iding Tool Support <br />Load Area <br />loader NA <br />68 NA <br />NA NA <br />$20.04 NA <br />$15.43 NA <br />NA NA <br />$30.65 NA <br />$66.13 NA <br />1 0 <br />Total work team cosVhour : $174.49 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 7,500 LCY <br />Source of quantity take-off <br />Source of estimated swell factor <br />Material purchase cost <br />IOURLY PRODUCTION <br />'ruck Caoaclty <br />Truck Payload (weight) Basis <br />Matedal weight <br />Descr.: Earth -dry packed <br />Rated payload <br />Payload capacity <br />Final adjusted tr <br />Swell <br />factor: NA <br />/rom site visit <br />Shift basis : 1 per day <br />ent <br />tp Area Road Maintenance Equipment <br />Motor Grader Water Trucl <br />NA NA NA <br />NA NA NA <br />NA NA NA <br />NA NA NA <br />NA NA NA <br />NA NA NA <br />NA NA NA <br />NA NA NA <br />0 0 0 <br />Loose <br />volume : 7,500 LCY <br />$0.00 /LCY Total cost : $0 <br />Truck Bed (volume) Basis <br />2,550 pounds/LCY Struck volume <br />Heaped volume <br />22,000 pounds Average volume <br />8.63 LCY Adjusted capacity <br />Eck capacity based on specific number of loader passes <br />Loading Tool Caoaclty: <br />Rated capacity (nom. heaped) : 3.750 LCY <br />Descr.:Other - rock/dirt mixtures (100-120% J Altitude adj. <br />Bucket fill factor : 1.100 Job efficiency <br />Adjusted bucket capacity : 4.125 LCY Net correction <br />8.00 LCY <br />10.00 LCY <br />9.00 LCY <br />8.63 LCY <br />8.25 LCY <br /> <br />Site altitude (ft.) : 4,700 <br />Truck Loader Source <br />1.000 1.000 (Cat HE <br />0.830 0.830 (1 shiR/da <br />0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.