Laserfiche WebLink
rIRCES Cost Estimating Software <br />PROJECT IDENTIFIGATION <br />Task # : 002 <br />Date : 03/23/2007 <br />User : ESC <br />Agency or organization name <br />Permit or other job action <br />Task description : <br />HOURLY EQUIPMENT COS <br />State :Colorado <br />County : Larimer <br />Site :Lyon King Quarry <br />Increase <br />PermiUjob# :111999-064 <br />Abbreviation :none <br />Filename : M064-002 <br />Basic machine :Cat D8R Series 11 - 8SU (2000 Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no.1 :BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank dpper <br />Data source : (CRG) <br />Utilization <br />Cost Breakdown- Ownership costlhour : $58.24 NA <br />Operatingcost/hour: $73.75 100 <br />Ripper op. costlhour : $0.00 0 <br />Operator costlhour: $32.78 NA <br />Total unit cosUhour : $164.77 Total fleet cosUhour : $164.77 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 800 CCY factor : 1.125 volume : 900 LCY <br />Source of estimated volume :Average 3" of topsoil <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted howdy production : 491.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % (I <br />Average site altitude : 8,500 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dezer(sj <br />Unit cost: $0.775 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.43 <br />Source <br />Adjusted unit production : 212.54 LCY/hr <br />Adjusted fleet production : 212.54 LCY/hr <br />Total job time : 4.23 Hours <br />Total job cost : $898 <br />