My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-26_REVISION - M1999064
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999064
>
2007-03-26_REVISION - M1999064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:44 AM
Creation date
11/21/2007 10:03:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999064
IBM Index Class Name
Revision
Doc Date
3/26/2007
Doc Name
Notification of Increase in Bond
From
DRMS
To
Abe Vasquez
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 001 <br />Date : 03/23/2007 <br />User : ESC <br />State :Colorado <br />Permit/job# : M-1999-Oti4 <br />County :Ladmer Abbreviation :none <br />Site :Lyon King Quarry Filename :M064-001 <br />Agency or organization name :DRMS <br />Permit or other job action :Surety <br />Increase <br />Task description : Back1)71 Qua1ry <br />::: ,: <br />_._ <br />:;. <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series ll - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. t : ROPS Cab <br />Attachmentno.2:3-shank <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $58.24 NA <br />OperatingcosUhour : $73.75 100 <br />Ripper op.cosUhour : $1.71 25 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $166.49 Total Fleet cost/hour : x166.49 <br /> <br />MATERIAL QUANTITIES ,:.: , <br />Initial Swell Loose <br />volume : 3,200 CCY factor : 1.215 volume : 3,888 LCY <br />Source of estimated volume :DRMS Estimate <br />Source of estimated swell factor :CAT Handbook <br /><:. <br />;: <br />HOURLY PRODUCTION Job Condition Cortection Factors Source <br />Average push distance : 150 feet <br />Unadjusted howdy production : 634.3 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 <br />Average site altitude : 6,500 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description <br />rock - 75% Rock, 25% Earth <br />JOB TIME AND COST <br />Operator skill : 0.75 <br />Matedal consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.70 <br />Blade type : 1.00 <br />Net correction : 0.35 <br />Adjusted unit production <br />Adjusted Fleet production <br />220.08 <br />220.08 <br />LCY/hr <br />LCY/hr <br />Fleet size : 1 Dozers) Total job time : 17.67 Hours <br />Unit cost : $0.756 /LCY Total job cost : x2,941 <br />
The URL can be used to link to this page
Your browser does not support the video tag.