Laserfiche WebLink
- A portable asphalt plant with a 14,000 gallon diesel tank <br />- A portable concrete plant <br />- Truck scale <br />- Mine office trailer <br />- A portable crusher & screen plant with a 8,000 gallon diesel tank <br />- A portable wash plant with a 3,000 gallon diesel tank (possible but not likely) <br />- A Fuel farm with various tanks as described in Table D-8, which will be located outside the <br />pit above Phase 1 mining area. See Map C-2 and C-4. <br />- Portable storage trailer, as shown on Map C-2. <br />The following list is the best estimate as to the equipment which will be used onsite throughout <br />the mine life: <br />- 2-3 Front end loaders <br />- 1-D-8 or D-9 size Bulldozer <br />- 1-14G Motor grader <br />- 1-4000 gallon water truck <br />- Volvo off road haul trucks (number will depend upon production needs) <br />- 15 and 24 ton on-road haul trucks (number will depend upon production needs) <br />Colona Pit November 06 D-8 <br />