My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-01-31_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2000-01-31_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:40 AM
Creation date
11/21/2007 9:54:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
1/31/2000
Doc Name
BATTLE MTN RESOURCES INC SAN LUIS PROJECT CDMG PN M-88-112 TR 26
From
BATTLE MTN GOLD
To
STATE OF COLO
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ • <br />' ~ Battle Mountain Resources, Inc. <br />Mr. Bill Lyle <br />January 29, 2000 <br />Page 4 of 4 <br />D) Miscellaneous <br />The other O&M cost component is replacement costs associated with various items such as <br />replacement costs for expandable filters, media material, parts and other components. This <br />cost estimate is conservative because the rate of parts and materials usage is higher during the <br />initial system start-up which was use as bases of estimation. When operated at steady state <br />condition (180 GPM) the system can be operated and maintain at optimal operational levels <br />that reduce maintenance costs. The estimated cost for various replacement parts and <br />expandable is $0.83 per 1000 gallon of treated water. <br />E) Sludge Disposal <br />The generated sludge's form the treatment plant will be transported and disposed off-site at <br />appropriately pemvtted local disposal facility. The sludge is estimated to be generated as a <br />rate of approximately I.5 to 2 tons of wet sludge per day. The cost for material handling, <br />transportation and disposal of sludge is estimated to be $0.16 per 1000 gallon of treated water. <br />Total Operation and Maintenance Cost <br />Based on the cost estimation cited above the overall cost for 1000 gallon oftreated water will <br />be $6.90 when the plant is operated at approximate operation discharge rate of 180 gpm. <br />ERNW appreciates BMR's consideration of ERNW for this project and we look forward to <br />working with BMR Staff. If you have any questions please contact Beh7ad Mirzayi, P.E. at <br />our Denver Office (303) 761-3497 x102. <br />Sincerely, , <br />eS hzadT~ yi,P.E. <br />ChiefO irtgflfficer <br />2') ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.