Laserfiche WebLink
EXHIBIT L <br />RECLAMAT/ON COSTS <br />1. Revegetation, 27.82 ac @ $500.00/ac <br />2. Recoiling, 14,960 yd3 x $0.405/yd3 <br />3. Slope Backfilling, 40,800 yd3 x $0.405/yd3 <br />4. Sloping using cut/fill method <br />8,694 yd3 * 1.23 x $0.17/yd3 <br />5. Seed bed grading and backfill slope shaping <br />16,133.00 yd3 x $0.17/yd3 <br />6. Secondary Seeding 27.82 ac @308 x <br />$500.00/ac <br />Net Total <br />5. Indirect costs <br />Mobilization <br />Insurance, Bond, & Profit <br />6. Administration costs <br />TOTAL ESTIMATE <br />BOND BE SET AT 557,400.00 <br />RECLAMATION COSTS (contl <br />$ 13,910.00 <br />6,052.93 <br />16,506.89 <br />1,846.20 <br />2,785.28 <br />4,173.00 <br />$45,274.30 <br />1,905.67 <br />5,670.60 <br />4,527.43 <br />$57,378.00 <br />20 <br />