My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-01-02_REVISION - M1986147 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986147
>
2003-01-02_REVISION - M1986147 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:08 PM
Creation date
11/21/2007 9:44:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986147
IBM Index Class Name
Revision
Doc Date
1/2/2003
Doc Name
Amendment Application
From
McAtee Construction Co.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L RECLAMATION COSTS <br />This reclamation cost estimate in based on the assumption <br />that there will be no more than 30.00 acres ± disturbed at any <br />one time. The following information also depicts a worse case <br />scenario. At that time McAtee will have to respread 14,960 cubic <br />yards of topsoil; do 8,194 cubic yards of cut/fill dozer work on <br />2300 lft of working face; backfill 40,800 cy on 600 feet and <br />revegetate 30.00 ac. ±. The table below outlines the various <br />areas of disturbance at that time. The amount of topsoil that <br />will be re-spread is based on an average of 4 inches. A D-8N <br />dozer will be used to do all shaping and seed preparation. As <br />631D scraper will be sued to haul topsoil and backfill material. <br />Mobilization costs are estimated as round trip costs, one way <br />distance of 6.5 miles and average speed of 40 mph. These figures <br />are then used in the calculations for the bond amount. The <br />revegetation cost figure includes fertilizer (aged manure), grass <br />seed, mulch and drilling costs. <br />This is done in an attempt to set the bond so there is <br />flexibility to operate without reevaluating the bond yearly. <br />RECLAMATION ACTIVITY AREAS (ac, Ift.) TOTALS <br /> Existing New Acres <br />REBOIL 18.00 12.00 30.00 <br />REVEGETATE 18.00 12.00 30.00 <br />CUT/FILL SLOPE SHAPING 800.00 1500.00 2300.00 <br />SLOPE BACKFILLING 600.00 0.00 600.00 <br />ROAD AREA 1.65 0.53 2.18 <br />EST/MATED UN/T COSTS FOR RECLAMAT/ON /TEMS• <br />Unit Cost <br />I. Revegetation includes grass seed mix and <br />labor to drill $ 500.00/AC. <br />2. Re-spreading soil and/or growth media with <br />631D scraper, haul distance less than 500 0.405/YD3 ,/ <br />3. Backfill slope with, 631D scraper, haul <br />distance less than 500 0.405/YD3 1/ <br />4. Shaping backfilled slopes and seed bed•grading. <br />D-8 cat, push distance less than 10 _ 0.17/YD3 i/ <br />5. Sloping using cut/fill method <br />D-8 cat, push distance less than 50 0.17/YD3 1/ <br />6. Secondary revegetation •$500.OO.ac <br />i/ Th ie equipment is for coat estimating only and the actual equipment used by the permittee <br />may vary. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.