Laserfiche WebLink
D. Equipment and Vehicles. Describe that which is proposed for use in your operation (Examples: <br />drill, dozer, wash plant, mill, etcJ. Include: sizes, capacity, frequency of use, etc. <br />Operations will normally be cominuous for one session a season. ap~roximat~ 40 dam but not to <br />E. Structures. Include information about fixed or portable structures or facilities planned for the <br />operation. Show locations on the map. Include such things as living quarters, storage sheds, <br />mill buildings, thickener tanks, fuel storage, powder magazines, pipelines, water diversions, <br />trailers, sanitation facilities including sewage disposal, etc. Include engineering design and <br />geotechnical information for project facilities, justification and calculations for sizing of tanks, <br />pipelines and water diversions, etc. <br />No structures will be buih. No powder magazines will be used No fuel will be stored on site. <br />No tanks, pipelines, or water diversions will be needed nor used. <br />waste will be disposed by following the "Leave No Trace" Qrridelines <br />Between active operation phases. nothing will remain on site. The site will be clean. Nothin w¢ ill be <br />V ENVIRONMENTAL PROTECTIONMEASL/RES (SEE 36 CFR 2281[) <br />A. Air Quality. Describe measures proposed to minimize impacts on air quality such as obtaining a <br />burning permit for slash disposal or dust abatemem on roads. <br />(If more space is needed to fill out a block ojinformation, use additional sheds and attach to jorm ) <br />use of mechanized ui ment. <br />Mining_activit~will be conducted during the dayli¢ht hours. Personnel will remain on site only <br />durine the active phase of minine when equ~ment is on site. uo to 40 days a season. <br />Eouiomem will be roaded in once and removed once unless a backhce is brouslrt in for a second time <br />to comotete reclamation. <br />