Laserfiche WebLink
C. ProjeM Description. Describe all aspects of the operation including mining, milling, and <br />exploration methods, materials, equipment, workforce, construction and operation schedule, <br />power requirements, how clearing will be accomplished, topsoil stcekpile, waste rock <br />placemem, tailings disposal, proposed number of drill holes and depth, depth of proposed <br />suction dredging, and how gravels will be replaced, eta Calculate production rates of ore. <br />Include justification and calculations for settling pond capacities, and the size of runoff diversion <br />channels. <br />Exoloration and mining will be small oQen pits and minor trenching in mineralized azeas as indicated <br />on the maps Areas aze irreprrlaz and unQedictable on anv >~ven claim. <br />Materials include shovels picks hammers chisels safety hats an~oeeles water canisters claim posts <br />used for some reclamation and re-contourine of excavation and prospect sites. <br />No construction is proposed. No power is needed. <br />6-hours per day Other hand divine and mineral extraction will take place all season urnil wiener <br />Two to four people will compose the workforce One person will be the machine operator other <br />of Minerals and Geoloev IDMG). Copies of all data and submittals to acquire these permits were <br />famished to the U.S.F.S.. South Pazk District Raneers Office in Fairplay. Colorado and should be <br />wnsidered part of this operations plan. <br />(If more space is needed to fit! out a block ojinformation, use additional sheets and attach to form. ) <br />hillsides and slow erosion. Trees wi116e replanted as 1>~ of reclamation efforts. <br />Topsoil will be se¢reeated and used to top-off backfills to the on ig pal depth in those azeas where <br />topsoil still remains. <br />Excavations will penetrate in-situ eranite to the maximum depth allowed by the decomposing.g~ranite. <br />This will average about 15 feet in any given prospect or excavation, but can reach 30 feet. <br />There will be no suction dredging_It is not applicable to this operation. <br />There aze no runoff channels. All excavations which could experience run-off are bermed <br />