My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-03-17_REVISION - M2003030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003030
>
2006-03-17_REVISION - M2003030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:07 PM
Creation date
11/21/2007 9:44:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003030
IBM Index Class Name
Revision
Doc Date
3/17/2006
Doc Name
110(s) application
From
Joseph L. Dorris
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planned equipment for reclamation will primarily consist of the same equipment which is <br />used for the excavation. Although a smaller track hoe can be used, we will generally use <br />a John Deere 690 or 2000. Its design allows it to bring overburden, including rock, back <br />up hill easily without a great deal of moving equipment azound on the site. The <br />excavator can also be used to redistribute topsoil from the storage pile and spread it out <br />over the re-cornoured surfaces. The bucket teeth aze excellent for creating furrows in the <br />soil to help catch seed and to prevent erosion until good growth is achieved. The <br />excavator can also reach in and around trees and boulders to more easily spread out the <br />overburden and create a more natural-appearing site. <br />6.3.4(11(bl Gradient of reclaimed slopes <br />No excavations will remove significant amounts of material that when backfilled will not <br />return the site to its original slope and contour. None of the original slopes on the <br />proposed sites aze greater than 3:1. No reclaimed slopes will be greater than 3:1. All <br />excavations will be filled to the original depth, re-contoured to the original contour, and <br />re-graded to the original surface shape. Additionally, re-contouring will be extended over <br />adjacent areas to eliminate preexisting hand-dug holes and trenches. We will reclaim <br />additional disturbed areas other than that which is caused by our operations. <br />Light furrows will be left along contour lines to help hold seed for re-growth and to stop <br />potential erosion. Silt fencing will be used below all excavation sites and disturbed areas <br />which occur on slopes of 20 percent or greater. Silt fences will be removed after 50 <br />percent growth is established. <br />Boulders and fallen dead timber will be arranged to give the site a natural look. All work <br />is aimed at returning the area to look natural and undisturbed (after re-growth). <br />6.3.4(11(cl Reveeetation <br />(i Plant erowth medium <br />The original plant growth medium from each site will be replaced to the original depth <br />from the stockpiles on each site. <br />(ii) Reseeding; <br />Reseeding will be accomplished in late autumn each season to take advantage of winter <br />moisture and to ensure good spring growth in accordance with Forest Service <br />recommendations. Soil is prepared for seed by raking after final contouring is completed. <br />Final contouring will be done immediately before seeding to ensure a good, aerated seed <br />bed. If the soil has become compacted, it will be re-raked to properly prepare the soil. If <br />any reclamation is carried over to the spring of the following mining season due to early <br />snows or unforseen events, seeding will take place as early as possible in the same <br />manner as above. <br />1' <br />l~ <br />~~ <br />_i <br />
The URL can be used to link to this page
Your browser does not support the video tag.