15. 6.3.4 EXHIBIT D -RECLAMATION PLAN <br />Also refer to proposed excavation and reclamation schedule under 6.3.3 Exhibit C and <br />reclamation maps in Exhibit E -Maps. <br />General: We plan to operate to have as minimal an environmental impact as possible. <br />One of our guiding principles for mining operations is to have as minimal an impact on <br />the scenic and environmental values as possible and to return the land to wildlife habitat <br />Our total production excavation sites including all disturbances is 9.6 acres out of a total <br />of 97 acres over a lifetime of 12 years. <br />Our excavation and production plan calls for opening about 1/3 of an acre per season <br />with additional disturbances of storage and machine footprint for a total of 1/2 acre per <br />season total disturbance. Reclamation will keep pace with any new disturbances so that <br />at most, 1 acre will be open or be just recently reclaimed. On average, 1/3 of an acre will <br />be reclaimed each season. <br />In general, we will open a new site or enlarge an excavation at an existing site to about <br />1/3 of an acre at the beginning of each season. A portion of any new disturbance will <br />also be reclaimed by the close of the season. The following season, we will again open <br />additional acreage to a total of about 1/3 acre. Other acreage will be filled, re-contoured <br />and reseeded by the close of the season so that about 1/4 of an acre remains open between <br />seasons at any given time. <br />Sites will be backfilled, re-contoured, and reseeded normally by late autumn so seed has <br />the best chance for growth the following spring. The year after an area has been reseeded <br />and growth has begun, any trees and shrubs planned for the site will then be planted. <br />These sites will be continuously monitored for growth. If necessary, re-seeding will be <br />accomplished until good growth and revegetation has been established and is successful. <br />6.3.4 (1) (al Overburden replacement: <br />Overburden will be replaced to the original depth from original stored topsoil and subsoil <br />immediately when an excavation site is filled. <br />Extraction of mined material is so insignificant, no settling nor depressions will remain. <br />Reclaimed areas will be slightly bowed since extracted materials expand. Over a season <br />or two, after being returned to the excavation site, the bulge will dissipate. <br />Reclamation will reclaim approximately 1/3 of an acre of disturbed area each season. <br />This includes the footprint of equipment being used, areas where topsoil was stored, <br />prospects, previously disturbed areas surrounding excavation sites, and the actual <br />excavation. <br />