Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 004 State :Colorado Permit/job# : M-1976-020 <br />Date : 04/17/2002 County : La Plata Abbreviation : none <br />User : WHE Site :Thomas Pit Filename : M020.004 <br /> <br />Agency or organization name : DMG <br />Permit or other job action : AM-Ol ' <br />Task description :Topsoil replacement foi irrigated field <br /> <br /> <br />HOURLY EQUIPMENT COST _ _ _ ..__ <br /> Basic machine :Cat D8R - 8SU Horsepower : 305 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $99.50 NA <br /> OperatingcosUhour : $65.98 100 <br /> Ripper op.cosUhour : $0.00 0 <br /> Operator cosVhour : $27.99 NA <br /> Total unit cosUhour : $143.48 Total fleet cosUhour : $143.48 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 4,756 LCY factor : NA volume: 4,756 LCY <br />Source of estimated volume :Exhibit E, Reclamation Plan <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION ~ Job Contlitior <br />Average push distance : 200 feet <br />Unadjusted hourly production : 491.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 <br />Average site altitude : 6,700 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />EaKh -Dry packed <br />JOB TIME AND COST <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />0.90 <br />1.00 <br />0.45 <br />(Cat <br />Adjusted unit production : 220.87 LCY/hr <br />Adjusted fleet production : 220.87 LCY/hr <br />Source <br />Fleet size : 1 Dozers) Total job time : 21.53 Hours <br />Unit cost : $0.650 /LCY Total job cost : $3,089 <br />