My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-04-18_REVISION - M1976020
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976020
>
2002-04-18_REVISION - M1976020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:06 PM
Creation date
11/21/2007 9:39:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976020
IBM Index Class Name
Revision
Doc Date
4/18/2002
Doc Name
Financial Warranty Reclamation Cost Estimation
From
DMG
To
Oldcastle SW Group Inc. dba Four Corners Materials
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 04/17/2002 <br />User : WHE <br />State :Colorado <br />County : La Plata <br />Site :Thomas Pit <br />PermiUjob# : M-1976-020 <br />Abbreviation :none <br />Filename : M020.003 <br />Agency or organization name : DMG <br />Permit or other job action : AM-Ol <br />Task description :Topsoil replacement for pond area <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - SSU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $49.50 NA <br />Operating cost/hour : $65.98 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $27.99 NA <br />Total unit cost hour : $143.48 Total fleet cost hour <br />MATERIAL QUANTITIES <br />$143.48 <br />Initial Swell Loose <br />volume: 3,260 LCY factor: NA, volume: 3,260 LCY <br />Source of estimated volume :Exhibit <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 300 feet <br />Unadjusted hourly production : 291.4 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 5.00 % (, <br />Average site altitude: 6,700 feet <br />Material weight : 2, 550 Ibs/LCY <br />Weight description <br />Earth - Drv packed <br />JOB TIME AND COST <br />Reclamation Plan <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Source <br />0.75 (avg.) <br />1.10 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1shifUda} <br />0.80 (fnd-rf) <br />1.11 (Cat HB) <br />1.00 (Cat HB) <br />0.90 (Cat HB) <br />1.00 (S/SU/U) <br />0.55 <br />Adjusted unit production :_ <br />__..._.._- _ _Adjustedfleetproduction__ <br />160.54 LCY/hr <br />160.54 LCY/hr <br />Fleet size : 1 Dozers) Total job time : 20.31 <br />Unit cost : $0.894 /LCY Total job cost : $2,914 <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />- -- - <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Hours <br />- i <br />
The URL can be used to link to this page
Your browser does not support the video tag.