My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-04-18_REVISION - M1976020
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976020
>
2002-04-18_REVISION - M1976020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:06 PM
Creation date
11/21/2007 9:39:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976020
IBM Index Class Name
Revision
Doc Date
4/18/2002
Doc Name
Financial Warranty Reclamation Cost Estimation
From
DMG
To
Oldcastle SW Group Inc. dba Four Corners Materials
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estlmatina Software <br />EQUIPMENT MOBILIZATION I DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organkation name: OMG <br />Tasks: 009 State:Colwadc PermiV~ob #: M-1976-020 <br />Date: 04/1]2002 County:La P/afa Abbreviation:none <br />User: WHE Site: Thomas PR Filename: M020-009 <br />Permit or otherjob action Am-01 <br />Task description ~. Haul retlamafion equipment to and from job site <br />4 <br />EQUIPMENT TRANSPORT RIG COST Shik basis: 1 perday <br />Cost data source: CRG Dete <br />Truck tractor description: Generic on-highway buck bactw, 6x4, diesel powered, 400 HP <br />Tmck trailer description :Generic foltling gooseneck, tlrop decX equipment beilw (25T, 50T, end 90TJ <br />.. ,_.____ ..,._ ._..___..-__ ... ._._ _. __i <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description WeighVUnit <br />(ions) Ownership <br />Cosdhr/unit Haul Rig <br />CasVhr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhrlFlee[ Return Trip <br />CosUhrlfleet DOT permit <br />CosVllee[ <br /> <br />-Cat D8R-8GU 52.22 $99.50 $114.69 1 $164.20 $114.69 $000 <br /> <br />-Revegefation equip 20.00 $20.00 $103.71 1 $123.71 $103.71 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Subtotals; 5281.91 5218./8 50.00 <br />t~ ._~_ <br />ROADABLE EQUIPMENT <br />Machine <br />Description ~_ ~ ~ <br /> <br />Total <br />CosVhour/unit _ ,n ___..-. <br /> <br />Fleet Size <br />(No units) . __._...- - <br /> <br />Haul Trip <br />CosUhrHlee[ ~_-..._ <br /> <br />Reurn Trip <br />CosUhrtlleet .._..-_u <br /> <br />-Flatbed Truck, 9x2, 30K GVW $43.93 f $93.93 $83.93 <br /> <br />-Ligh(Oury Pickup. 4x4, 1 T $29 ]0 1 $29.70 $29.70 <br /> <br />-Fuel canker 4x2, 170 HP $45.51 1 $45 51 $45 51 <br /> <br />-Cube Duck, 4x2170 HP 852.49 1 85244 $5244 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Subtotals: 5111.5] 5171.67 <br />EpUIPMENT HAUL DISTANCE antl TIME <br /> Nearest major sty or town within protect area region: Durango <br />Transoorta[ion CVdeTme- Non- Total one-way travel distance: 12.0 miles <br /> Roadable Roatlable Average travel speed'. 450 mph <br /> Equipment Equipment <br />Haul time (hours) = 02] 0.27 Total non-roadable mobldemob cost': $895.85 <br />Return time(hcurs)= 0.27 027 'cxo mans Npz vnN naU ng <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost": $91.50 <br />Unbading time (hours)= 0.50 NA wee .owe mp,re NWnq <br />Subtotals= t53 0.53 <br />I __. _ <br />JyBTIME AND COST Total job time: 3.07 hours <br /> Total cob cost: §937 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.