Laserfiche WebLink
EXHIBIT A -LEGAL DESCRIPTON <br />The amended San Luis Project permit area covers 1861 acres with the following legal <br />description. The Universal Transverse Mercator coordinates (NAD 1927) of the main <br />mine entrance are shown on Figure A-1. No additional mining is proposed under this <br />permit amendment. Descriptions of the properties immediately adjacent to the San <br />Luis Project can be found in the 1989 permit amendment. <br />OCT 9 0 2QQ6 <br />Division of Reclamation, <br />A. Battle Mountain owned lands. Mining and Safety <br />1. A tract of land located in a fraction of the El Plomo Tract and situated in <br />fractions of Sections 16, 17, 20 and 21, Township 32 South, Range 71 <br />West of the 6a' Principal Meridian, Costilla Estates Survey, so called, <br />Costilla County, Colorado, being more particularly described by metes <br />and bounds as follows: <br />Beginning at El Plomo Tract Corner P-13 (3'/z" Aluminum Cap, PLS <br />14840); thence N 00°24'20" W a distance of 1314.01 feet to EI Plomo <br />Tract Corner P-IZ (3'/z" Aluminum Cap, PL.S 14840}; thence S 89°24'36" <br />E a distance of 659.43 feet to El Plomo Tract Corner P-11 (3'h" Brass <br />Cap, PLS 10389); thence N 00° 13'37" W a distance of 668.38 feet to El <br />Plomo Tract Corner P-10 (3'/z" Brass Cap, PL.S 10389); thence N <br />89°42'28" E a distance of 1319.65 feet to EI Plomo Tract Corner P-9 (3'/z" <br />Brass Cap, PLS 10389); thence N 00°11'03" W a distance of 1310.49 feet <br />to El Plomo Tract Comer P-8 (3'/s" Brass Cap, PLS 10389); thence N <br />89°45'37" E along the North line of the El Plomo Tract a distance of <br />1307.10 feet; thence S Ol°01'50" W a distance of 321.01 feet; thence S <br />58°32'51" E a distance of 284.62 feet; thence N 70°24'05" E a distance of <br />284.04 feet; thence S 48°58'27" E a distance of 1240.27 feet; thence N <br />22°16'07" E a distance of 518.00 feet; thence S 55°00'00" E a distance of <br />485.90 feet; thence S 10°05'06" E a distance of 238.10 feet; thence S <br />60°57' 16" E a distance of 296.11 feet; thence N 30°21'58" E A distance <br />of 288.53 feet; thence N 72°47'23" E a distance of 394.43 feet; thence S <br />30°06'45" E a distance of 357.92 feet; thence S 02°27'44" W a distance of <br />457.01 feet; thence N 87°58'07" E a distance of 388.32 feet; thence S <br />47°02'33" E a distance of 892.28 feet; thence S 20°IS' 16" W a distance of <br />592.92 feet to a point on the centerline of Rito Seco Creek; thence <br />following said centerline for the following 12 courses: N 74°12'59" W a <br />distance of 273.94 feet; thence N 83°52'30" W a distance of 247.04 feet; <br />thence S 32°53' 19" W a distance of 213.21 feet; thence N 24°54' 10" W a <br />Battle Mountain Resources, Inc. 4 Telesto Solutions, lnc. <br />N:Wnjects~212-Newmom(SaN.~is)~SanLUisNermi~Ame~bment- Wu~Pit MViagemcnt\V4Reportffi PDFS~PmnnAmenament_vA.000 October 2006 <br />